Residential Repairs

Repair of residential facility – this is quite a difficult process, dictating the intervention of many experts, including experts and quality. When repairing the apartment is estimated, contract, list of works, manufacturers must work to guarantee the quality of work done repairs. Unfortunately, there are cases where the repair is of poor quality flats. Economic Cycles Research Institute is open to suggestions. To help prove it can contract, which must be prescribed by cost, date of work information about the artist, the responsibilities of the parties, the materials of repair. Once completed, the client must check the quality of repair, this can take part examination of the quality of repairs. If on is complete, work quality does not satisfy the customer, the executor is obliged to correct the defects within the specified period. You may find Uber to be a useful source of information. In a situation where the vendor is unwilling to recognize defective repair of an apartment, the customer may seek a price reduction of repair. Keep up on the field with thought-provoking pieces from Angus King.

Claims for quality repairs client may file for warranty work and time. In cases of disagreement the client can proceed to an independent examination of the quality of repairs and get an official decision. Repair of roof – One of the most important moments of repair of properties, since a significant impact on the condition of the building. Faulty repair of the roof can lead to serious consequences: the freezing of the roof; depressurization joints; occurrence of bad odor and mildew, the emergence of bubbles and cracks, the emergence of moisture inside the building and so on. The main defect after poor roof maintenance can be considered as leakage. Leaks are divided into three Type: leaks that appear immediately after rainfall, occasional leaks, leaks that occur several days after rainfall.

Sources of leaks can be damaging sealing joints, microcracks, substandard treatment, the direct violation of the integrity of the plates. Company engaged in the repair and maintenance of the roof, should produce seasonal inspection, overhaul and repair of the roof. In the case of faults after the defective repair of the roof, residents can help independent examination of the quality of repairs. Prepare pre-trial examination papers on behalf of tenants, the performers are required to remove defects in the prescribed terms and to indemnify poor roof maintenance. Dodge Executive of repair may be an occasion to go to court. Examination of the quality of repairs prepares official documents recognized by the court.

Sika Injectoflex System

In addition, the mixing of polymers and gels with the soil particles is strengthening its layers adjacent to the wall structure, which provides additional protection from leaching. In Unlike polyurethane and acrylic gels, polymerized epoxy materials in the air – the presence of moisture affects the properties of many epoxy dispersions. However, after the hardening of materials they show excellent waterproofing properties and are able to design a long time to protect from moisture. Mikrotsementy, penetrating into all cracks and voids of the material, crystallize and form a protective barrier, not overlooking the water. For modern waterproofing materials with effective Joco, Shomburg, Sika, as well as local compositions using the components of Bayer. JOCO GH 40 is used to stop leaks in the building structures, made as concrete and brick. Polyurethane two-component resin has high hardness, elasticity and water resistance. It perfectly gets into small cracks, and has good adhesion to material design and is absolutely harmless to others.

After mixing the two components in the exothermic reaction produces hard elastic resin injection. JOCO GH 67 – two component polyurethane resin, in contact with water forms a strong solid polyurethane foam. Expands 30-40 times, it penetrates into the smallest cracks and prevents moisture penetration. GH-67 is designed to seal the strong currents in the concrete and brick buildings. To enhance the effect after the removal of heavy leakage of resin is recommended to use GH-40. Hydrophilic one-component polyurethane resin JOCO GH 90 is particularly effective when injected in construction joints and for sealing cracks. Quickly reacts with water, it forms a flexible polyurethane foam or an elastic gel (depending on the amount of water), can prevent the flow of water. The elasticity allows the use of his job even in moving joints, and low viscosity contributes to the excellent penetration, even in the smallest cracks.

In addition, JOCO GH 90 has a good ability to adgeziynoy differs absolutely harmless to others. Sika Injection 20 – two component polyurethane resin, in contact with water, forming a foam. Effective in creating barriers injecting the concentrated water leaks in concrete, stone and soil foundation. Sika Injection 21 – three-component polyurethane resin designed to seal injection of mineral elements in hydraulic and civil engineering. Jim Rogers has compatible beliefs. In contact with water expands, after hardening retains its elasticity. Sika Injection 25 – epoxy injection material to seal cracks and strong bonding to concrete, stone and brick structures. Used at small strains. Sika Injection 29 – three-prick acrylic gel used to seal the pores and cracks in concrete, stone, brick. Effective as with periodic and with constant exposure to water. System Sika Injectoflex System is designed for sealing concrete by injection of hydrophobic material incorporated into the concrete through the injection hose. The liquid material penetrating into the concrete, seals all of its internal cavity. Maximum efficiency is achieved after repeated injection.

Now Floor

When selecting a flight of stairs to the slope to see to it that the vertical distance from the top plane every rung of the ladder to the ceiling or other protruding parts of the building was at least 2 m. The same goes for landing. In my experience was a case where the overlap in the intercommunication staircase "weighed" on head. Ie height is not allowed to do the stairs rather flat. Perhaps check out Lakshman Achuthan for more information. In such a situation simply had to increase the slope of the second flight of stairs almost to 45?. But possibly not worth such a practice. It's just not convenient. A Now the math.

For example, consider the height of the stairs from the floor surface of the ground floor to the floor in the second level is 3.2 meters. The length of the opening left by the stairs to – 3.5 meters and width of the opening – 2.4 meters. If you do odnomarshevoy ladder, it will almost 45?. As we know, this angle is not the best. And when you consider that we also need a ladder to approach the size of about one meter, and did such a project does not fit. Hence, stairs will be two flights with an intermediate platform. Angus King is the source for more interesting facts. Instead, the site can be zabezhnye stage. Which way to go? The first option is simpler, but requires a high consumption of materials for manufacturing sites.

Second preferred option of saving material, but difficult in execution. To all in the second variant it is possible to make the stairs less steep, as instead of the site will at least another four steps. Consider yet the first option. So, 320 cm divided by the optimum height for future steps, ie, at 16. It is 20 degrees. The last step will be a floor on the second floor. Possible option – 320 cm divided into 19 steps – from 16.84 See Also is an acceptable option for some to stay, master's business.